District Collector conducts surprise inspection in Panamarathupatti, Salem
यहाँ देखें:
📘 Facebook
Salem District Collector K. Elambagavath, IAS, conducted an on-site inspection today (08.10.2026) of the ongoing house construction work being carried out under the housing scheme at Panamarathupatti Union.
The house is being constructed at an estimated cost of ₹3.50 lakh.
Deputy Collector (Training) Ms. P. Divya was also present during the inspection.
The house is being constructed at an estimated cost of ₹3.50 lakh.
Deputy Collector (Training) Ms. P. Divya was also present during the inspection.